x
Loading...

CITY MED - AGIOS IOANNIS

CLIENT
ARCHITECTS
YEAR
PROGRAM
STATUS

CITY MED – AGIOS IOANNIS

City Med: Medical & Doctors Offices in Limassol

City Med is a state-of-the-art medical and doctors’ office building strategically located in the heart of Limassol,Arch. Makarios III Avenue,along one of the city’s most prestigious roads. This modern development is designed to meet the highest standards of functionality and aesthetics, providing an ideal environment for healthcare professionals and patients alike.

Featuring contemporary architecture, advanced infrastructure, and premium finishes, City Med offers spacious, well-planned offices tailored for medical practitioners, clinics, and allied health services. Its prime location ensures excellent accessibility, visibility, and proximity to key amenities, making it a sought-after address for healthcare providers who value prestige and convenience.

City Med is more than just a workplace, it is a hub for innovation and excellence in healthcare, setting a new benchmark for medical office spaces in Limassol.

Delivery date: 12/2027


Energy performance of building 'A' Structure
Lower strength of C30 concrete.


Ceramics - Sanitary ware
Raised floor with laminated wood


Interior Walls
Bricks 10cm thick, two coats of plaster, one coat of fiber eraser, three coats of MIPAPOL spatula and STATUS eco-mat THRAKON paint


External Walls
Heat-insulating bricks 30cm thick and two coats of plaster.
German thermal facade 10cm with 3 coats of TIRAKON TH-410 fiber eraser.
Texture coating STATUS.


Ceilings
False ceiling with panel 60X60


Windows – Doors (external)
Double glazing, heat-insulating UPVC REHAU / Kommerling.


Interior Doors
Imported or manufactured, price €300 each.


Plumbing / Drainage
Italian Triplus® Push-fit polypropylene sound-insulating pipes for the drainage and gutter system (Valsir)
Italian manifolds and multilayer pipe-in-pipe system with aluminum layer in the middle (Giacomini)
Italian pressure system for hot and cold water.
Solar system with German boiler.


Insulation
Italian bituminous membrane (Copernit)


Fencing walls
Fiber eraser THRAKON TH-410.
Texture coating STATUS.


Electrical Engineering Services
All electrical works will be carried out in accordance with the floor plans and will be approved by the Cyprus Electricity Authority.
1.Provisions of air conditioners.
2.Provision for a wireless alarm system (extra socket).
3.Provision for structured cabling of the television and telephone system.
4.Parking lot light sensor.
5.Outdoor waterproof sockets.


Photovoltaic panels
Austrian photovoltaic system with 8 kw application for communal areas.


External Works
Drainage
The septic tank, absorption pit and rainwater pit are made in accordance with the instructions of the local authorities.


TOTAL 3250M² COVERED AREAS
1st FLOOR: 351m² FLOOR Office Space - 172m² HALF FLOOR Office Space - 85m² QUARTER FLOOR Office Space
2nd FLOOR: 351m² FLOOR Office Space - 172m² HALF FLOOR Office Space - 85m² QUARTER FLOOR Office Space
3rd FLOOR: 351m² FLOOR Office Space - 172m² HALF FLOOR Office Space - 85m² QUARTER FLOOR Office Space
4th FLOOR: 351m² FLOOR Office Space - 172m² HALF FLOOR Office Space - 85m² QUARTER FLOOR Office Space
5th FLOOR: SOLD
6th FLOOR: 351m² FLOOR Office Space - 172m² HALF FLOOR Office Space - 85m² QUARTER FLOOR Office Space